vibrock-connect-version-2-logo-1-v3

The All New Vibrock Connect Android App

Our all new Vibrock Connect Android App allows users to receive LIVE DATA from our V9000(Modem) Vibration Monitors.
As well as receiving vibration data, the Vibrock Connect App also allows you to check the health of your V9000 machine, providing information on memory integrity and battery capacity.

Calibration of our machines is very important when it comes to the operations of your project. Our new app will notify you when your V9000 needs re-calibrating. With these features and more we have transformed the V9000 into an essential tool for any company looking to monitor vibration data remotely and in real-time.

vibrock-connect-top-img-1-v2

Vibrock Connect, bringing new capabilities to the V9000

Vibrock-Connect-App-Features-and-benefits

Note:
V9000 requires updating before working in conjunction with the Vibrock Connect app. Contact us to upgrade your V9000. App works with devices using Android 5.0 (Android Lollipop) or later.

A COMPLETE SERVICE
Who better to operate the equipment than the manufacturer. Our consultation services are second to none.

PRODUCT SUPPORT
At Vibrock, our product experts are on hand to give you the support you need to stay operational.

DELIVERY WORLDWIDE
Vibrock deliver services across the globe.

logo-slider-2-v1
logo-slider-3-v1
logo-slider-1-v1
WHITE-LOGO-4-V1
logo-slider-6-v1
WHITE-LOGO-5-V1
Vibrock have worked with Liberty Industrial on numerous projects in Australia, conducting ground vibration and air overpressure predictions at sensitive receptors for explosive events including at Wallerawang Power Station, Munmorah Power Station and Altona Refinery, Victoria.
Vibrock were engaged by Brown and Mason Group Limited to conduct ground vibration and air overpressure predictions and monitoring from 8 Explosive events during the decommissioning of the site between 2022 and 2025. During the project, which included the demolition of the 198 metre main chimney stack and the Guiness World Record of 8 cooling towers in demolished in one event, Vibrock advised on the ground vibration and air overpressure impacts at adjacent sensitive receptors, including assets as close as 60 metres, to allow the projects to proceed. Vibrock monitored all events with our vibration monitoring equipment which were found to be within our predicted levels.
Vibrock recently provided noise and vibration consultancy services as part of a DCO application for a new 2.5 million cubic metre extension at East Northants Resource Management Facility treatment and disposal site near Peterborough.